Acro RefrigerationAcro Refrigeration
    Cold Room Construction

    Cold Room Construction

    When you need new cold storage capacity, our in-house team designs, fabricates and installs custom HACCP-compliant cold rooms built to last.

    500+
    Cold Rooms Built
    15yr
    Avg Panel Life
    100%
    HACCP Compliant
    2wk
    Avg Build Time

    What's Included

    From single-door coolrooms to multi-zone freezer facilities, we handle every stage — site survey, engineering design, panel fabrication, refrigeration fit-out and commissioning. All builds use PIR or PUR or EPS panel insulation and food-grade finishes to suit your cold storage needs.

    Discuss Your Needs

    Key Benefits

    • Full design-to-commissioning service
    • Correctly sized and spec insulated panels
    • Food-grade stainless steel finishes, where required
    • Energy-efficient refrigeration systems
    • Built to HACCP and Food safety Standards
    • Ongoing maintenance packages available

    How It Works

    1

    Site Survey

    On-site assessment of space, access, power and compliance requirements.

    2

    Design & Quote

    Engineered drawings, equipment specification and detailed fixed-price quote.

    3

    Build & Install

    Panel fabrication, refrigeration fit-out and electrical connection.

    4

    Commission & Certify

    System testing, temperature validation and compliance certification.

    Frequently Asked Questions

    How long does a cold room build take?

    Depending on size, most standard builds take 1-4 weeks to build. Complex multi-zone facilities may take 6-8 weeks.

    Can you retrofit into an existing space?

    Absolutely. We specialise in retrofitting cold rooms into existing commercial kitchens and warehouses.

    Refrigeration Emergency? We're On Call 24/7.

    Don't lose stock to a breakdown. Call now or book a maintenance plan to prevent it happening in the first place.