BP Tinana Refrigeration Fitout (Dual Coolrooms & Freezer – Engineered for Load Performance)
Full refrigeration installation delivered for BP Tinana, including dual coolrooms and a freezer system designed to meet product load requirements and maintain consistent temperature performance.














14 photos
The Challenge
The existing refrigeration setup was not fit for purpose and required a full rebuild. The project involved replacing the existing system with new dual coolrooms and a freezer, all designed to meet specific product load and pull-down requirements within a live retail fuel site environment.
Our Solution
We removed the existing infrastructure and delivered a complete refrigeration rebuild, installing two cool rooms and one freezer system engineered to meet defined load capacities and temperature performance. All equipment was selected, installed and commissioned to ensure consistent operation under real trading conditions, with full integration of controls, safety components and electrical interfaces.
Results & Outcomes