    Cold Room Construction

    Fast Food Store Cold Room Build – Red Rooster Bundaberg (Delivered Without Site Power)

    Complete cold room build delivered for a new Red Rooster store in Bundaberg, overcoming site constraints and ensuring readiness for opening.

    Bundaberg, QLD
    Red Rooster
    Build New Cold Room & Freezer Room
    Fast Food Store Cold Room Build – Red Rooster Bundaberg (Delivered Without Site Power) — image 1
    Fast Food Store Cold Room Build – Red Rooster Bundaberg (Delivered Without Site Power) — image 2
    Fast Food Store Cold Room Build – Red Rooster Bundaberg (Delivered Without Site Power) — image 3
    Fast Food Store Cold Room Build – Red Rooster Bundaberg (Delivered Without Site Power) — image 4
    Fast Food Store Cold Room Build – Red Rooster Bundaberg (Delivered Without Site Power) — image 5
    Fast Food Store Cold Room Build – Red Rooster Bundaberg (Delivered Without Site Power) — image 6
    Fast Food Store Cold Room Build – Red Rooster Bundaberg (Delivered Without Site Power) — image 7
    Fast Food Store Cold Room Build – Red Rooster Bundaberg (Delivered Without Site Power) — image 8
    Fast Food Store Cold Room Build – Red Rooster Bundaberg (Delivered Without Site Power) — image 9
    Fast Food Store Cold Room Build – Red Rooster Bundaberg (Delivered Without Site Power) — image 10
    Fast Food Store Cold Room Build – Red Rooster Bundaberg (Delivered Without Site Power) — image 11
    Fast Food Store Cold Room Build – Red Rooster Bundaberg (Delivered Without Site Power) — image 12

    12 photos

    The Challenge

    This was a new build with a fixed opening date and no margin for delay. The site had no available power during construction, requiring all works to be completed under temporary conditions while coordinating with multiple trades to meet the program.

    Our Solution

    We delivered a full cold room build, including refrigeration systems, working off a generator to maintain progress without reliance on site power. The installation was coordinated with the broader construction program to ensure seamless integration and readiness for store opening.

    Results & Outcomes

    Cold room delivered in line with the construction program
    Generator supplied to enable works without site power
    System installed, commissioned and ready for opening
    Delivered on time and on budget